  • Barrage hydro-électrique sur la rivière Sturgeon / Power Dams on the Sturgeon River
    Barrage hydro-électrique sur la rivière Sturgeon / Power Dams on the Sturgeon River
    Image       The spill dams on the Sturgeon River were built in 1923-24 with a continuous pour of 5,399 cubic yards of concrete in 10 hour shifts. The municipality of West Nipissing bought the hydro dams when Weyerhaeuser closed down its mill in the early 2000s.
    Image     The spill dams on the Sturgeon River were built in 1923-24 with a continuous pour of 5,399 cubic yards of concrete in 10 hour shifts. The municipality of West Nipissing …
    Société historique de Nipissing Ouest
  • Historic covered coal conveyor belt
    Historic covered coal conveyor belt
    Image       According to Abitibi records, in May 1950, two 60,000 lb./hr. 300 PSI (pounds per square inch) pieces of equipment were installed. In the same period, a new 50-ton per hour coal handling system was put into operation.
    Image     According to Abitibi records, in May 1950, two 60,000 lb./hr. 300 PSI (pounds per square inch) pieces of equipment were installed. In the same period, a new 50-ton per hour …
    Société historique de Nipissing Ouest
  • Équipe de démolition de Restoration Environmental Contractors, Sturgeon Falls / Restoration Environmental Contractors Demolition Crew, Sturgeon Falls
    Équipe de démolition de Restoration Environmental Contractors, Sturgeon Falls / Restoration Environmental Contractors Demolition Crew, Sturgeon Falls
    Image       Équipe de démolition de Restoration Environmental Contractors après la démolition du mouline Weyerhaeuser à Sturgeon Falls. / Restoration Environmental Contractors demolition crew after the demolition of the Weyerhaeuser mill in Sturgeon Falls.
    Image     Équipe de démolition de Restoration Environmental Contractors après la démolition du mouline Weyerhaeuser à Sturgeon Falls. / Restoration Environmental Contractors demolition crew after the demolition of the Weyerhaeuser mill in …
    Société historique de Nipissing Ouest
  • Weyerhaeuser water tower removal, Sturgeon Falls
    Weyerhaeuser water tower removal, Sturgeon Falls
    Image       The Weyerhaeuser mill, located on Cache Bay Road in Sturgeon Falls, had its own water tower to generate water pressure for fire protection purposes. This water tower, along with the entire mill, were removed in 2004
    Image     The Weyerhaeuser mill, located on Cache Bay Road in Sturgeon Falls, had its own water tower to generate water pressure for fire protection purposes. This water tower, along with the …
    Société historique de Nipissing Ouest
  • Moulin Weyerhaeuser, Sturgeon Falls / Weyerhaeuser Mill, Sturgeon Falls
    Moulin Weyerhaeuser, Sturgeon Falls / Weyerhaeuser Mill, Sturgeon Falls
    Image       Une des dernières photos prise du moulin Weyerhaeuser à Sturgeon Falls. / One of last photos taken of the Weyerhaeuser mill before it was demolished in 2004. This photo was taken before a six-month contract that took this mill down and proceeded with an environmental abatment. In 2011, there is …
    Image     Une des dernières photos prise du moulin Weyerhaeuser à Sturgeon Falls. / One of last photos taken of the Weyerhaeuser mill before it was demolished in 2004. This photo was …
    Société historique de Nipissing Ouest
Web Tools:
Dublin Core | Mods
Contributors
  • Société historique de Nipissing Ouest
Media Types
Location
Groups
Item Types
  • Photographs
Years
20002000200120022003200420052006200720082009
Creative Commons