Results
Page 1 of 1
- Blind River Library Relocation Put On Holding Pending Assessment, 1999Norlyn Purych, The Sault Star, September 15, 1999 A brief article about the anticipated move of the Blind River library being put on hold until an engineering assessment could be done to determine building safety.Norlyn Purych, The Sault Star, September 15, 1999 A brief article about the anticipated move of the Blind River library being put on hold until an engineering assessment could be done to determine building safety.Blind River Public Library
- Work on Iron Bridge to be Completed Tuesday, 1999Caroline Van Luit, The Sault Star, November 29, 1999 The bridge was built by Pete Schmitz, and was funded by various sources and much of the work was done by volunteers in addition to the professionals.Caroline Van Luit, The Sault Star, November 29, 1999 The bridge was built by Pete Schmitz, and was funded by various sources and much of the work was done by volunteers in addition to the professionals.Huron Shores Museum
Page 1 of 1